I have been thinking of this and might get a larger UPS like we use in the datacenter at the office, I need to do a measurement on how much power I draw though to size it up correctly. That would handle cutover, and long term would be to get a small generator. Not sure the wife will sign off on that though... need to get her to watch some prepping shows and remind her the end of the world is scheduled soon